Blog · Release and maintenance
Three releases of a live app in ten days
By Shahid Hussain, senior mobile & web engineer ·
In October 2026 I took over a live Android app for a client, an Ethiopian calendar on Google Play, from the teammate who built its first version. Three releases went out in ten days: 1.4, 1.5 and 1.6. Small, frequent releases are the safest way I know to change an app people already use, and this is how they went.
Release 1.4: simplify first
Before adding anything, I took out what was hardest to change safely. Nothing new for users, and less that could break in the releases after it.
Release 1.5: a smaller download
Release builds now strip unused code and resources, so the app takes less space on the phone and less time to download.
Release 1.6: make it feel right
- Ads arrive in the order the screens appear, so the first screens get theirs first.
- Banners keep a fixed size, so the layout no longer jumps when one loads.
- On the first launch, onboarding no longer waits for its ads.
Right after 1.6, tabs started keeping their place when you switch between them, and the first screen stopped waiting on anything before it appears.
What made it safe
- One idea per release. Each release had a theme, so if something went wrong, there was one place to look.
- Small changes. Each release changed little, so it could be checked quickly and rolled back cleanly.
- The version number went up every time. Google Play refuses an upload whose version code it has seen before, so a missed bump blocks the release at upload.
If you’ve inherited an app, taking over an app from another developer is the checklist for the first week, and why is my app slow? covers a slow start.
About the author
Shahid Hussain is a senior mobile & web engineer in Islamabad, Pakistan (UTC+5), with 27+ apps shipped to production in SwiftUI, Flutter, React and Next.js, for Zavi Technology and independent clients.